Bulolo Gold Deposits
nULOLO Gold Deposits report that the re cently acquired area of 50 acres (previously advised as 45 acres) adjoining the Morobe area is estimated to contain 2,500,000 cubic yards of alluvials with average values of 1/3 a yard. This property will be worked from the company’s pre
sent water race. The manager states that 20,000 cubic yards a month can be treated at a cost of 4d a cubic yard. Sluicing will be begun on this area about the end of July.
Owing to late delivery of material the instal lation of the elevating plant rn the Morobe pro perty has been delayed, but it is expected that operations on a larger scale will be reached by the beginning of July. In the meantime sluicing operations are being continued on this area and on the Bulolo terraces.
Bulolo Gold Deposits returns show:
Bulolo Dredge Production
Production for the four dredges of the Bulolo Cold Dredging Ltd. for May:
flncluding 100,000 cubic yards tailings.
Reduced output in April and May was due to changing the courses of two dredges, which re quired the digging of a large volume and talings and overburden.
Enterprise Of New Guinea
For period April 30 —May 22; — Surprise Creek: Monitor sluicing proceeded on part time only. Three faces now in operation.
For month ended April 20, 670 z. Idwt. of unre fined retorted gold recovered from all sources.
Sluiced 6,700 cubic yards. Edie Creek: Comtruc tion of pilot plant advanced another stage towards completion. No. 1 W. drive main lode, advanced
in ore to 591 ft. from portal. Samples taken as drive proceeded gave assays (from 530 ft. to sSoft) ranging from 3dwt. to lOdwt. 9.6 gold and loz. sdwt. 96 grns. to 7oz. lOdwt. silver. Width of samples ranged from 21 to 54 inches. Drainage adit to 420 ft. from portal.
Production of unrefined retorted alluvial gold for May was 560 z. 13dwt. from 1667 cubic yards wash dirt and 2738 cubic yards overburden.
Sunshine Production
The general manager reports under date May 16. during daylight hours the sinker and No. 2 elevator were in operation. During night hours sluicing and elevating were confined to extending the paddock in a southerly direction. The Watut River wing (for the diversion of the river) was further extended during this period.
Sandy Creek Production
New Guinea Goldfields
Alluvial:
Upper Watut Gold
Published May 16:-—No. 1 pontoon, 13,477 yards for 1230 z. Week ended May 8, No. 2 pontoon worked 130 hours. Elevator worked continuously.
Published May 28A clean up of No. 2 pon
toon returned 130 oz. gold from 17,137 cubic yards.
Published June 9. —A clean up of the elevator workings gave 51oz. from 10,462 cubic yards.
Oil Search, New Guinea
It was reported on May 28: Aerodrome pre pared near drilling site at Mandated Territory, providing air communication to port at Wewak.
Road surveys for access to structure to be drilled progressing satisfactorily. Recent advices from field suggest an early determination as to best route obtainable.
(Continued Overleaf)
Feb.
Mar.
April 4- May 6 June 7 Wash, cub. yd. ... 24,200 — .— .— Gold, oz. 86 .— .— — Bulolo—- Cub. yd. — 18,000 12,000 14,000 Gold, oz. — 84 60 50 Morobe — Cub. yd. — 3,800 — 4,500 Gold, oz. •Partial clean up. 71 75* 60
March tApril May Cubic yard 918,000 977,000 901,000 Bullion, oz. 17,806 12,101 11,261 Gold, fine oz 12,384 8.390 7,746
Value:
Aust. currency* ... £108,360 £73,412$ £67,777$ Per cubic yard — /28.3 /18.0 /17.9 Working profit £77,542 £53,086 £53,865 ♦At £A8/15/- per fine ounce.
March April May Hours 760 527 474 Cub. yd 31,256 23,000 24.000 Cold, oz 231.75 487 336.25
Jan. Feb. Mar. Apr. May Cubic yards 7,345 9,420 9,934 8,611 8,590 oz 139 ' 219 262 160 132 Per cub. yd. 2/10 3/5£ 3/11* 2/9 1-3 2/3*
Feb.
Mar.
Apr.
Fine gold, oz 900 850 702 Fine silver, oz. ... 644 532 513 Golden Ridges Mill: Fine gold, oz 1,127 819 758 Fine silver, oz. 821 747 860 Edie Creek Mill: Fine gold, oz. 1,552 795 1,801 Silver, oz 2,972 1.591 4.228 Estimated profit: Edie Creek Mill ... £4,982 •£1,088 £7,449 Alluvial £4,107 £3,293 £2,532 Golden Ridges Mill £4,438 £1,690 £563 loss, due to mill days for shaft timbering. being shut for 14