The news magazine of the South Pacific · since 1930

Pacific Islands Monthly, 23 April 1937Vol. VII, No. 9

Rewa Bridge Opens In May

p. 74 · Read in the full issue

From Our Own Correspondent.

Suva, Apr. 3.

AT long last the much awaited bridge over the Rewa River is nearing completion. It is anticipated that it wfll be opened to traffic in May.

Only one small span requires to be thrown across, and then there will not remain much to be done. On appearances the bridge is going to be a handsome and durable structure, and will be a credit to the engineer in charge (Mr. Williams) and his staff.