Production.
p. 26 · Read in the full issue
Bulolo Dredge
Production of the No. 1 and No. 2. dredges of the Bulolo Gold Dredging Ltd., for October compares with that of the previous periods as follows: Period ended — Aug. 31. Sep. 30. Oct. 31.
Cubic yards 488,900 440,900 488,100 Bullion oz. 12,134 11,063 12,218 Gold, fine, oz 8,045 7,335 8,101 Aust. currency* £60,337 £55,012 Per cubic yard ...» /29.61 /29.94 /29.6 G Working profit £A48,247 £A41,370 £A47,737 £60,757 * At £A7/10/- per fine ounce,
Dredges 3 And 4.
Dredge No. 3 is now (Nov. 9) digging out of the construction pit, and bed rock should be reached on the eastern margin of pay in the second half of November. Bottom plates and frames of No. 4 dredge have been laid.